![Carrier EVERGREEN 23XRV Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/carrier/evergreen-23xrv/evergreen-23xrv_installation-instructions-manual_2562182026.webp)
26
1
2
2
3
4
5
6
a23-1697
10
11
9
8
7
a23-1698
12
1
3
14
15
Fig. 18 — Cooler/Discharge Pipe Assembly Removal (Unit with P Compressor Shown)
1 — Discharge Pipe
2 — Tubesheet Mounting Bracket (Inside, Both Ends)
(Unbolt)
3 — Cooler Liquid Feed Line (Cut)
4 — Motor Drain Line (Unbolt)
5 — Motor Cooling Line (Cut)
6 — Economizer Line to Compressor (Option) (Cut)
7 — Oil Supply
8 — Vaporizer Vent Line (Cut)
9 — Motor Cooling Line
10 — Oil Reclaim Line (Cut)
11 — Hot Gas Bypass Line (Cut)
12 — Compressor Discharge Temperature
13 — Compressor Discharge Pressure
14 — Compressor Discharge High Pressure Switch
15 — Discharge Pipe Relief Valve (Option or Accessory)
FRONT VIEW
BACK VIEW
Содержание EVERGREEN 23XRV
Страница 53: ...53 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown NOTE See Notes for Fig 60 on page 56 ...
Страница 54: ...54 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1585 ...
Страница 55: ...55 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1586 ...
Страница 60: ...60 Fig 63 23XRV Controls Schematic LF 2 ...
Страница 63: ...63 SEE NEXT PAGE SEE NEXT PAGE SEE NEXT PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown ...
Страница 64: ...64 FROM PREVIOUS PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown cont ...
Страница 73: ...73 Fig 78 Lead Lag Control Wiring Parallel Flow Application Unit with R Compressor Shown a23 1597 ...
Страница 74: ...74 Fig 79 Lead Lag Control Wiring Series Flow Application Unit with R Compressor Shown a23 1598 ...