3
contractor and/or customer. Carrier has no installation respon-
sibilities for the equipment.
Job Data —
Necessary information consists of:
• job contract or specifications
• machine location prints
• rigging information
• piping prints and details
• field wiring drawings
• starter manufacturer’s installation details
• Carrier certified print
INSTALLATION
Step 1 — Receive the Machine
INSPECT SHIPMENT
1. Inspect for shipping damage while machine is still on ship-
ping conveyance. If machine appears to be damaged or
has been torn loose from its anchorage, have it examined
by transportation inspectors before removal. Forward
claim papers directly to transportation company.
Manufac-
turer is not responsible for any damage incurred in transit.
2. Check all items against shipping list. Immediately notify
the nearest Carrier representative if any item is missing.
3. To prevent loss or damage, leave all parts in original pack-
ages until beginning installation. All openings are closed
with covers or plugs to prevent dirt and debris from enter-
ing machine components during shipping. A full operating
oil charge is placed in the oil sump before shipment.
IDENTIFY MACHINE (Fig. 1-8) — Refer to machine name-
plate in Fig. 1. The machine model number, serial number, and
heat exchanger sizes are stamped on the Refrigeration Machine
nameplate located on the side of the VFD (variable frequency
drive) enclosure. Check this information against shipping pa-
pers and job data.
CAUTION
Do not open any valves or loosen any connections. The
23XRV machine may be shipped with a full refrigerant
charge. Some machines may be shipped with a nitrogen
holding charge as an option.
Fig. 1 — Refrigeration Machine Nameplate
a23-1547
Содержание EVERGREEN 23XRV
Страница 53: ...53 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown NOTE See Notes for Fig 60 on page 56 ...
Страница 54: ...54 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1585 ...
Страница 55: ...55 Fig 60 Typical Field Wiring Schematic LF 2 VFD Shown cont a23 1586 ...
Страница 60: ...60 Fig 63 23XRV Controls Schematic LF 2 ...
Страница 63: ...63 SEE NEXT PAGE SEE NEXT PAGE SEE NEXT PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown ...
Страница 64: ...64 FROM PREVIOUS PAGE Fig 67 23XRV Controls Schematic Rockwell Standard Tier VFD Shown cont ...
Страница 73: ...73 Fig 78 Lead Lag Control Wiring Parallel Flow Application Unit with R Compressor Shown a23 1597 ...
Страница 74: ...74 Fig 79 Lead Lag Control Wiring Series Flow Application Unit with R Compressor Shown a23 1598 ...