8
Electric Voltage
This pictogram indicates that there are electrical com-
ponents behind this access cover, door or panel that
may be dangerous for the user/installer. Only per-
sonnel qualified in accordance with local standards
permitted to carry out work on these components.
The pictogram is attached to the access cover for the
electric heater control box.
Z Profiles
This pictogram is located at the bottom of the fan sec-
tion and indicates that the z profiles must be removed
during commissioning before the fan is started up.
Capacity Label
This label contains the data for the AHU, such as or-
der number, type of AHU, etc. The label is normally
located on the door of the fan cell or on the access
cover.
Opening the Fan Cell
This pictogram is positioned on the outside of the
door or access/guard cover of the fan assembly.
This pictogram warns that the fan must have been
switched off and de-energised for a minimum of two
minutes before the door or access / guard cover is
opened.
Caution: All doors and access / guard covers must be
closed before starting up the AHU.
Cell Matching Label
This label shows that matching surfaces of AHU units
for assembly. It is located at bottom right and left cor-
ner of the units. Sample label is above.
Lifting and Transport
An instruction is attached to the AHU describing the
procedures that must be followed for lifting and trans-
port. For further details on this subject, see Chapter
2.
Packing materials must be disposed of in a respon-
sible manner end in accordance with local regula-
tions.
2. TRANSPORT & LIFTING IN-
STRUCTIONS
2.1. General
Transport and lifting of 39HQ AHUs must always be
in accordance with the instructions below. If these in-
structions are not observed, irreparable damage may
occur to the unit, and people in the immediate vicinity
of the unit are also endangered. Alarko Carrier San-
ayi ve Ticaret AS does not accept any responsibility if
these instructions are not observed.
Transport and lifting must be carried out by qualified
personnel. The AHU must only be lifted with lifting
bars supplied by Alarko Carrier Sanayi ve Ticaret AS.
Lifting must be carried out in accordance with local
regulations and with the help of certified lifting aids.
2.2. Transport & Storage
Lifting of the AHU is only permitted under the des-
ignated lifting methods. For transporting marked
points shall be used. If it is not possible to use
marked points due to the loading conditions, trans-
porting can only be done by forklift (cranes can-
not be used) from under the side base frame profiles.
This applies to transport as well as storage, and is
indicated on the base frame profiles by warning label.
AHUs are delivered as side by sections. Moving the
plastic cover will let the dirt and particulates enter to
the unit from openings.
Содержание AiroVision 39 HQ
Страница 2: ...2 Code No B 8 1 3i Book Publication Date 081018 Revision No 081018 ...
Страница 5: ...5 39 HQ Air Handling Units AiroVision Assembly Installation Commissioning Maintenance Manual ...
Страница 6: ...6 ...
Страница 23: ...23 ...
Страница 31: ...31 ...
Страница 40: ...40 APPENDIX 1 CELL INFO AND CONNECTION ORDER ...
Страница 41: ...41 APPENDIX 2 FRONT WITHDRAWAL FILTER DETAIL ...
Страница 42: ...42 APPENDIX 2 FRONT WITHDRAWAL POUCH FILTER INSTALLATION ...
Страница 43: ...43 APPENDIX 2 SIDE WITHDRAWAL COMBINED FILTER INSTALLATION ...
Страница 44: ...44 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F8 F9 ...
Страница 45: ...45 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F7 ...
Страница 46: ...46 APPENDIX 3 1 Side Withdrawal Filter ...
Страница 47: ...47 APPENDIX 3 2 Front Withdrawal Filter ...
Страница 48: ...48 APPENDIX 3 3 Pleated Filter ...
Страница 51: ...51 ...
Страница 52: ......