12
• Then place the anti-vibration rubber pads to the
location where the next cell will be positioned and
then place this section on rubber pads.
• Before placing the each cell adjacent to another,
fix the insulation tape supplied between the sec
-
tions. This should be done in four sides, and the
sealing tape should overlap at the corners (See
Fig. 15 and 19).
• Details of anti-vibration pads (location, dimension,
quantity,...) are given in customer drawings.
The labels showing the matching surfaces are for
easily matching the unit surfaces correctly during as-
sembly of AHU. Same numbers should be side by
side.
Note:
Attach the insulation tape supplied to only one
of the two assembled sections.
• Place the sections together as close as possible.
Ensure that both sections can still be moved. In-
sert a lifting bar into both sections, so that they
can be pulled closer towards each other.
Two methods can be used for pulling the sections to-
wards each other:
Method 1
Pull the sections against each other, using the pull
ropes attached to the lifting bars. Pull evenly on both
sides of the AHU.
Fig. 11.
Connecting sections using pull ropes
Fig. 12.
Connecting the sections using threaded bars
Fig. 13.
Unit having equal width and height
Method 2
Insert a bar with threaded ends through both lifting
bar holes. Screw a nut onto the threaded ends of the
bar and tighten it. Pull evenly on both sides of the
AHU.
Note:
Before connecting the sections, they should be
horizontally and vertically aligned.
5.2. Connection of Modules having
Equal Width and Height
To connect the AHU sections, use one of the follow-
ing methods according to AHU construction.
Method 1
This method applies for sections ending with cell con-
nection profiles.
Check that the four corner flags are attached.
Содержание AiroVision 39 HQ
Страница 2: ...2 Code No B 8 1 3i Book Publication Date 081018 Revision No 081018 ...
Страница 5: ...5 39 HQ Air Handling Units AiroVision Assembly Installation Commissioning Maintenance Manual ...
Страница 6: ...6 ...
Страница 23: ...23 ...
Страница 31: ...31 ...
Страница 40: ...40 APPENDIX 1 CELL INFO AND CONNECTION ORDER ...
Страница 41: ...41 APPENDIX 2 FRONT WITHDRAWAL FILTER DETAIL ...
Страница 42: ...42 APPENDIX 2 FRONT WITHDRAWAL POUCH FILTER INSTALLATION ...
Страница 43: ...43 APPENDIX 2 SIDE WITHDRAWAL COMBINED FILTER INSTALLATION ...
Страница 44: ...44 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F8 F9 ...
Страница 45: ...45 APPENDIX 2 SIDE WITHDRAWAL FILTER INSTALLATION F7 ...
Страница 46: ...46 APPENDIX 3 1 Side Withdrawal Filter ...
Страница 47: ...47 APPENDIX 3 2 Front Withdrawal Filter ...
Страница 48: ...48 APPENDIX 3 3 Pleated Filter ...
Страница 51: ...51 ...
Страница 52: ......