START-UP CHECKLIST FOR 09FC WATERSIDE ECONOMIZER
(Remove and use for Job File)
A. PROJECT INFORMATION
Job name _____________________________________
Address
_____________________________________
City ______________________State ____Zip_________
Equipment tag/mark for____________________________
Installing contractor_______________________________
Sales office _____________________________________
Start-up performed by_____________________________
Unit
Model ____________________________________ Serial________________________________________
B. PRELIMINARY EQUIPMENT CHECK (This section to be completed by installing contractor)
1. Is there any physical damage?
Yes
No
Will this prevent start-up?
Yes
No
Description:
2. Power supply agrees with the unit nameplate.
Yes
No
3. Correct control voltage ________vac.
Yes
No
4. Electrical power wiring is installed properly.
Yes
No
5. Unit is properly grounded.
Yes
No
6. Electrical circuit protection has been sized and installed properly.
Yes
No
7. All terminals are tight.
Yes
No
8. All plug assemblies are tight.
Yes
No
9. All cables and thermistors have been inspected for cross wires.
Yes
No
10. All thermistors are installed and fully inserted into wells.
Yes
No
Chilled Water System Check
1. All water valves are open.
Yes
No
2. All piping is connected properly.
Yes
No
3. All air has been purged from the system.
Yes
No
4. Units installed in open loop: inlet piping to evaporator includes a 20 mesh strainer
within 10 ft of unit.
Yes
No
5. Water loop volume greater than 3 gal/ton (40 L/kW) for air conditioning
or 6 gal/ton (80 L/kW) for process cooling and low ambient operation.
Yes
No
6. Proper loop freeze protection provided to ____
F (
C).
Antifreeze type__________________ Concentration _____%.
Yes
No
NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere
to the safety considerations/information as outlined in
preceding sections of this Installation, Start-Up and
Maintenance document.
Содержание 09FC020
Страница 8: ...8 Fig 5 09FC 020 Unit Dimensions...
Страница 9: ...9 Fig 6 09FC 030 Unit Dimensions...
Страница 10: ...10 Fig 7 09FC 040 Unit Dimensions...
Страница 11: ...11 Fig 8 09FC 050 Unit Dimensions...
Страница 12: ...12 Fig 9 09FC 060 Unit Dimensions...
Страница 13: ...13 Fig 10 09FC 070 Unit Dimensions...
Страница 14: ...14 Fig 11 09FC 080 Unit Dimensions...
Страница 69: ......