Fig. 4 —
Rigging Label
1. 1.50 dia (38.1mm) lifting holes provided for field supplied clevis.
2. Rig with a minimum of 25 ft (7620mm) length chain or cables.
3. If central lifting point is used, it must be minimum of 13 ft.
(3962mm) above the top of the unit.
4. Spreader bars made from steel or double nailed, and notched
2x6’s approximately 8 ft. (2438mm) long, must be placed just above
the top of the unit and coils.
5. If overhead rigging is not available, the unit can be moved on
roller or dragged. When unit is moved on roller, the unit steel skid, if
equipped, must be removed. To lift the unit, use jacks at rigging
points. Use a minimum of one roller every 6 ft. (1829mm) to
distribute the load. If the unit is to be dragged, lift the unit as
described above, and place unit on a pad. Apply moving force to the
pad, not the unit. When in its final location, raise the unit and
remove the pad.
6. Check the bill of lading to determine shipping weight of the unit.
Содержание 09FC020
Страница 8: ...8 Fig 5 09FC 020 Unit Dimensions...
Страница 9: ...9 Fig 6 09FC 030 Unit Dimensions...
Страница 10: ...10 Fig 7 09FC 040 Unit Dimensions...
Страница 11: ...11 Fig 8 09FC 050 Unit Dimensions...
Страница 12: ...12 Fig 9 09FC 060 Unit Dimensions...
Страница 13: ...13 Fig 10 09FC 070 Unit Dimensions...
Страница 14: ...14 Fig 11 09FC 080 Unit Dimensions...
Страница 69: ......