
7–41
T-372
3. On the Probe Calibration screen, click on the Calibrate Supply sensors or Calibrate Return sensors button
(see
).
Figure 7.27 DataLINE - Calibrate Sensors Button
4. A Location of Service pop-up window will appear (see
). In the appropriate fields, enter the
Service Center Name and Service Center Location where the calibration is being performed. Then, click the
Save button. A pop-up window will appear reminding the user to ensure proper ice bath temperature. Click
OK to acknowledge and remember to maintain the Ice bath at 0°C (32°F).
Figure 7.28 DataLINE - Enter Service Center Information
5. Prepare the ice bath. Refer to the Ice bath preparation procedure.
Ensure that the set-up (i.e. ice bath, sensors, reference thermometer) has reached a stable state before
beginning the calibration process. Ensure that the set-up is clean and the reference thermometer is
regularly maintained and calibrated.
Содержание PrimeLINE 69NT40-571-001
Страница 2: ......
Страница 4: ......
Страница 14: ......
Страница 36: ......
Страница 110: ......
Страница 116: ......
Страница 171: ...8 1 T 372 SECTION 8 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 1 Legend Standard Unit Configuration ...
Страница 172: ...T 372 8 2 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 2 Schematic Diagram Based on Drawing 62 11957 ...
Страница 176: ......
Страница 178: ......
Страница 180: ......
Страница 184: ......
Страница 185: ......