6.1 Testing before installation:
If the applicator has been assembled after a major repair or maintenance operation, it is recommended to
do a function test before the applicator is returned to production.
The extent of the test is dependent on the degree of maintenance performed on the applicator and the
available test facilities.
A minimum level of function test is to connect the compressed air supply, checking for air leakage by
opening each of the solenoid valves manually.
The electrical connections can be checked using an ohm
-
meter to test the connections from the plug to the
terminals and to make sure that there are no short circuits.
Make one last check on all fasteners and then follow the installation instructions (Chapter 3, page 17) to
mount the applicator on the robot.
If the applicator is tested off
-
line with
material pressure applied it
’
s very important
to take appropriate safety measures to
prevent personal injury!
WARNING
!