Cardi HYDRO 1-100 Скачать руководство пользователя страница 12

 

 

4

 

 

 

....................................................................................................................................................................................………………….............. 

SECURING BY A VACUUM PLATE 

- Warning : If you drill a wall or if you work far from the ground (drilling 

(VACUUM PUMP) 

ceiling), you have to strengthen this fixing system, using props. So you can avoid that, if there is 
an anomalous vacuum production, all the equipment falls out. 
- Warning : This fixing system is not recommended for diameters  > 250 mm. 
Proceed as follows : 
 

 

- Set in the appropriate groove on the base ( the hole used to fasten the stand by an anchor bolt) 
the kit attachment for vacuum pump connection (a cover complete with rubber seal, pipe fitting and 
vacuometer) and tighten its screws. 
- Then fit the rubber vacuum gasket in the slot under the base, and unloose the four levelling screws 
until they are not extended beyond the base. 
- Connect the vacuum pump flexible pipe to the pipe fitting on the base. 
- Turn off the cock on the vacuum cover and switch on the pump. 
- Settle the rig where you want to drill, turn on the cock and drive forward the base until it grips the 
bearing surface. 
- Check then the depression value. You can start drilling when the depression value that you 
read on the vacuometer settled on the base is at least 0,8 bar. 
- Use levelling screws to avoid unnecessary vibrations during drilling. 

-

 

Warning : If during drilling the depression value decreases and becomes < 0,8 bar, 
immediately stop working, turn off the motor, find and eliminate the reason of the 
vacuum leakage. 

.........................................................................................................……………..................... 
- If the rubber vacuum gasket is fitted in the slot under the base, don't move it by dragging sideways : 
you damage the gasket. 
- Don't put the machine leaning it on the base, but place it horizontally or remove the gasket under the 
base. 

....................................................................................................................................................................................……………………................ 

MIXED FIXING SYSTEM 

- When the fastening by an anchor bolt or the securing with vacuum pump doesn't ensure a sufficient 
steady fixing of the machine (either the diameter of the hole you have to drill is > 250 mm or you are 
using very powered motors with a very low rotation speed), you have to use also props to shore 
sufficiently the base and the column of the rig. 

 

.................................................................................................................................................................................…………………….................. 

OVERDRILLING 

- If something anomalous causes the looseness (loosening) of the rig, close rigidly the fixing system, 
and be careful : the core bit must be aligned and true with relation to just drilled hole. 
- If there are some defects in alignment or truing, the core bit can't go on because its shell strips. 
If the feed is not allowed, move a little the axis of the hole. If it is not possible, don't go on drilling and 
make another hole, with the same axis of the first one ("overdrilling"), its diameter being > 15-20 mm. 
 

........................................................................................................................................................................................……………………........... 

BLOCKS 

- When the material to be drilled is not a part of a big construction, be sure that it is well anchored or 
clamped firmly. 

.................................................................................................................................................................................……………………................... 

4 - HOW TO USE THE DIAMOND CORE DRILLING EQUIPMENT 

...............................................................................................................................................................................................……………………..... 

PRELIMINARY CHECK 

- Warning : Before drilling a reinforced-concrete structure, be sure that you don't damage the 
structure. Do as the planning chief tell you . 
- Warning : Don't cause damages to gas or plumbing pipelines in the working area. 
- Warning : When drilling into walls, floors or wherever "live" electrical wires may be 
encountered, do not touch any metal parts of the machine. 
Operate the machine only by the plastic handles to prevent shock if you drill into a "live" wire. 
 
 

......................................................................................................................................................................................…………………….............. 

SIGNAL DRILLING AREA 

- Before drilling walls or floors, be sure that the core, falling out of the hole, doesn't cause damages to 
anything. However you have to delimit and sign the working area : place warning signals around it. 

 
 

-

 

If the core, falling out of the hole, can cause damages to something or somebody, make the 
right supporting framework to hold the core when you stop drilling. 

 
 
 
 
 
 

................................................................................................................................................................................……………………................... 

TYPES OF CORE BIT 

- You have to utilize the correct type of core bit in function of your drilling material : ask us for the core 
bit correct for your application. 

-

 

If you use a core bit not suitable for your drilling material or a blunt core bit, you can cause : a 
big overload of the motor, too long drilling time, severe wear of the diamond segments. 

 
 
 
 

 

Содержание HYDRO 1-100

Страница 1: ...IDRAULICO MANUALE DI ISTRUZIONE E ASSISTENZA CARDI srl Sede legale ed amministrativa 24030 PONTIDA BG Italia Via Leonardo da Vinci 21 tel 035 795029 fax 035 796190 e mail info cardi ita com http www...

Страница 2: ...prima di collegare i tubi dell olio Rimuovere qualsiasi mezzo di regolazione o chiave prima di accendere il motoriduttore Una chiave di lasciata su una parte rotante pu causare lesioni personali Mant...

Страница 3: ...ua di raffreddamento Nel caso di materiali porosi o con fessure e nel caso di forature secanti eliminate se possibile le vie di fuga dell acqua iniettata ed aumentatene al massimo la portata per garan...

Страница 4: ...to alloggiamento della base il foro oblungo utilizzato nel fissaggio a tassello il kit per il collegamento alla pompa a vuoto otturatore completo di manometro chiudendo le viti e le piastrine di fissa...

Страница 5: ...li danni allo stesso tempi di perforazione eccessivamente lunghi forte usura dei segmenti diamantati AFFILATURA DEI SETTORI Dopo avere utilizzato ripetutamente la corona per forare materiali molto dur...

Страница 6: ...o viceversa una spinta eccessiva provoca una rapida usura del settore diamantato Attenzione Durante la perforazione assumete posizioni stabili tenete le mani lontane dalla corona in rotazione i capell...

Страница 7: ...a carota e il riutilizzo della corona Qualora la carota rimanga bloccata all interno della corona diamantata cercate di frantumare la carota stessa con uno scalpello agendo sempre in modo da evitare d...

Страница 8: ...fare sostituire tali parti presso un centro di assistenza autorizzato Manutenzione programmata raccomandabile far controllare l intero motoriduttore dopo un periodo di 250 ore di lavoro presso il pi v...

Страница 9: ...ED CORE DRILL HEAD SAFETY AND INSTRUCTION MANUAL CARDI srl Sede legale ed amministrativa 24030 PONTIDA BG Italia Via Leonardo da Vinci 21 tel 035 795029 fax 035 796190 e mail info cardi ita com http w...

Страница 10: ...Check that the hydraulic power unit has a pressure adjustment set for max operating pressure 150bar for HYDRO 1 25 and 180bar for HYDRO 1 50 HYDRO 1 80 HYDRO 1 100 Attention This requirement of safet...

Страница 11: ...RING BY A VACUUM VACUUM PUMP not suggested fo big or long holes MIXED FIXING SYSTEM Every time you drill you have to decide the right fixing system FASTENING This fixing system is very effective but n...

Страница 12: ...or you are using very powered motors with a very low rotation speed you have to use also props to shore sufficiently the base and the column of the rig OVERDRILLING If something anomalous causes the l...

Страница 13: ...oil temperature must be comprised between 30 and 60C during the normal operations With the motor completely stopped select the correct R p M for your drilling Then start the motor moving the lever of...

Страница 14: ...core bit If you have just made a vertical through hole the core usually goes out of the hole by oneself and fall headlong from the other side of the floor If the core falling out of the hole can cause...

Страница 15: ...al Cardi spare parts 7 NORMATIVES The diamond core drilling equipments manufactured by Cardi are in compliance with the European Directives CE and the specific international standards see the CE decla...

Отзывы: