Cardi HYDRO 1-100 Скачать руководство пользователя страница 11

 

 

3

.....................................................................................................................................................................................…………………….............. 

2 - WATER CONNECTION 

..............................................................................................................................................................................................……………………...... 

WATER 

- For the right use of core bits you have to cool diamond segments during drilling and keep clean 
drilled hole and drilling area.
 
You can do it using water or air. 
- The water can flow in working area directly from the water mains or with a manual pump or a 
submersible pump sucking  it from buckets or other containers. 

 

- If you use water, you have to check that water pressure and flow rate are 

 

enough to cool the core bit and clean the hole. 
- Diamond segments can be damaged if there is not enough water also for a short time. 
- You can check if the water flow is right looking through the cutting water that goes out from the hole. If 
it is fluid, flow rate is correct; if it is not fluid, but like a mud, you either have to check why the water 
inflow is not correct and remove the impediment or boost water flow rate. 
- If you have to enlarge a just drilled hole, you have necessarily to obstruct the hole for a correct 
cooling water inflow. 
- If you have to drill porous or crack materials or make a secant drill, eliminate the water escape 
ways and boost at maximum level water flow rate to cool the core bit enough. 

...................................................................................................................................................................................……………………................ 

OVERHEAD-DRILLING 

- When overhead-drilling, it's advisable that you utilize a pneumatic or an hydraulic motor or 
even a IP55 THREE PHASE motor. 
If you drill overhead a water collecting device must be always utilized. 
- We suggest to utilize the water collecting device also when drilling into walls or floors. 
- The water collecting device is available as accessory. 
To fix the device to the stand follow the instructions supplied from the manufacturer. 
- If you don't utilize the water collecting device, however you have to collect the water far from the 
working area,  

....................................................................................................................................................................................……………………................ 

3 - HOW TO ASSEMBLY THE DIAMOND CORE DRILLING EQUIPMENT 

...........................................................................................................................................................................................……………………......... 

- The right fixing system is necessary to : 

- safety in working, 
- a good performance of your machine, 
- good holes, 
- long life of power units and core bits. 

- The possible fixing systems are : 

- FASTENING BY AN ANCHOR BOLT, 
- CLAMPING BY PROPS, 
- SECURING BY A VACUUM (VACUUM PUMP- not suggested fo big or long holes), 
- MIXED FIXING SYSTEM. 

Every time you drill, you have to decide the right fixing system 

..................................................................................................................................................................................……………………................ 

FASTENING 

- This fixing system is very effective but not very quick.  

BY AN ANCHOR BOLT  

You need an anchor bolt for each hole you make with the machine. 
- Warning : The fastening with an anchor bolt is not suitable when the drilling material has not a 
mechanical resistance enough to hold the anchor bolt (for example : perforated bricks). 
- Proceed as follows : 

- Mark the centre of the hole you want to drill with your machine. 
- Then mark the position of the anchor bolt using the drill centre point indicator or following the 
mesure suggested in the schedule at page 15. 
- Make an hole and put into the hole the adequate anchor bolt - bolt shank's minimum diameter : 12 
mm -. 
Anchor bolts to fasten our rigs are available as accessories : ask us for them. 
- Set the anchor bolt. 
- Fasten the base of the rig and adjust the four levelling screws until the column is upright. Use a 
spirit level to check it. 

......................................................................................................................................................................………………….............................. 

CLAMPING BY PROPS 

- This fixing system is quick and cheap. 
- Warning : The clamping by props is not recommended for diameters >250 mm. 
- Proceed as follows : 

- Mark the centre of the hole you want to drill with your machine. 
- Then set the base of the rig. 
- With the conventional adjustable props brace the base, as we show you in the enclosed scheme 
(picture). 
- The top of the column is provided with an adjusting screw. You can use it with a pipe to shore the 
column vertically. 
- Adjust the four levelling screws until the column is upright. Use a spirit level to check it. 

-

 

Warning : During drilling you have to keep very closed all the adjusting systems of the 
props.
 So you can avoid that, during drilling, the vibrations loosen them, damaging the 
steadiness of the rig. 

.............................................................................................................................................................................…………………....................... 

SECURING BY A VACUUM PLATE 

- This fixing system is quick and cheap, but you need a bearing surface : 

(VACUUM PUMP) - 

smooth, so you can avoid air leaks

solid enough, so you can avoid that the external layer of the bearing surface breaks away ( 
not well fixed plastering or tiles). 

-

 

If the surface is solid but with upward bumps or depressions, level it, smoothing the bumps or 
plastering where you put the vacuum gasket. 

-

 

 

 

Содержание HYDRO 1-100

Страница 1: ...IDRAULICO MANUALE DI ISTRUZIONE E ASSISTENZA CARDI srl Sede legale ed amministrativa 24030 PONTIDA BG Italia Via Leonardo da Vinci 21 tel 035 795029 fax 035 796190 e mail info cardi ita com http www...

Страница 2: ...prima di collegare i tubi dell olio Rimuovere qualsiasi mezzo di regolazione o chiave prima di accendere il motoriduttore Una chiave di lasciata su una parte rotante pu causare lesioni personali Mant...

Страница 3: ...ua di raffreddamento Nel caso di materiali porosi o con fessure e nel caso di forature secanti eliminate se possibile le vie di fuga dell acqua iniettata ed aumentatene al massimo la portata per garan...

Страница 4: ...to alloggiamento della base il foro oblungo utilizzato nel fissaggio a tassello il kit per il collegamento alla pompa a vuoto otturatore completo di manometro chiudendo le viti e le piastrine di fissa...

Страница 5: ...li danni allo stesso tempi di perforazione eccessivamente lunghi forte usura dei segmenti diamantati AFFILATURA DEI SETTORI Dopo avere utilizzato ripetutamente la corona per forare materiali molto dur...

Страница 6: ...o viceversa una spinta eccessiva provoca una rapida usura del settore diamantato Attenzione Durante la perforazione assumete posizioni stabili tenete le mani lontane dalla corona in rotazione i capell...

Страница 7: ...a carota e il riutilizzo della corona Qualora la carota rimanga bloccata all interno della corona diamantata cercate di frantumare la carota stessa con uno scalpello agendo sempre in modo da evitare d...

Страница 8: ...fare sostituire tali parti presso un centro di assistenza autorizzato Manutenzione programmata raccomandabile far controllare l intero motoriduttore dopo un periodo di 250 ore di lavoro presso il pi v...

Страница 9: ...ED CORE DRILL HEAD SAFETY AND INSTRUCTION MANUAL CARDI srl Sede legale ed amministrativa 24030 PONTIDA BG Italia Via Leonardo da Vinci 21 tel 035 795029 fax 035 796190 e mail info cardi ita com http w...

Страница 10: ...Check that the hydraulic power unit has a pressure adjustment set for max operating pressure 150bar for HYDRO 1 25 and 180bar for HYDRO 1 50 HYDRO 1 80 HYDRO 1 100 Attention This requirement of safet...

Страница 11: ...RING BY A VACUUM VACUUM PUMP not suggested fo big or long holes MIXED FIXING SYSTEM Every time you drill you have to decide the right fixing system FASTENING This fixing system is very effective but n...

Страница 12: ...or you are using very powered motors with a very low rotation speed you have to use also props to shore sufficiently the base and the column of the rig OVERDRILLING If something anomalous causes the l...

Страница 13: ...oil temperature must be comprised between 30 and 60C during the normal operations With the motor completely stopped select the correct R p M for your drilling Then start the motor moving the lever of...

Страница 14: ...core bit If you have just made a vertical through hole the core usually goes out of the hole by oneself and fall headlong from the other side of the floor If the core falling out of the hole can cause...

Страница 15: ...al Cardi spare parts 7 NORMATIVES The diamond core drilling equipments manufactured by Cardi are in compliance with the European Directives CE and the specific international standards see the CE decla...

Отзывы: