Making Checks After
Completion of Installation
Work
Disposal Parts Check
Following disposal parts are remained after completion of the
installation work.
[1]
Reverse Trailing Edge Guide (In the case
it was installed in the Host Machine.)
1 pc.
[2]
Inner Connector Cover
1 pc.
[3]
Remaining Tray Setting Labels
1 pc.
[4]
Remaining Language Jam label (Booklet
Finisher only.)
1 pc.
[4]
Remaining Caution Language Label
(Booklet Finisher only.)
1 pc.
Operation Check
1.
Turn ON the main power of the Host Machine.
2.
3.
4.
If a message prompting the user to update the
version appears, press [Update] to automatically
update the version of the Finisher.
NOTE:
If [Skip] is selected, a message prompting the user to
update the version will appear every time the Host
Machine is started. In the service mode (Level 2) shown
below, it is possible to set not to display the message.
• (Level2) COPIER > OPTION > FNC-SW > VER-
CHNG
5.
Check the operation such as paper feed and stapling
to make sure that problems such as a jam or
malfunction do not occur.
7. Installation
213
Содержание Staple Finisher-AA1
Страница 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Страница 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Страница 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Страница 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Страница 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Страница 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Страница 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Страница 178: ...A B Feed Direction Stapling Position Fixing Screw A B Stitcher Unit Fixing Screw Fixing Screw Mark 5 Adjustment 170 ...
Страница 184: ... Adjsting Phase Angle of the Paddle Unit 1 Put off the belt 1 1 2 Lower the swing roller till its end 5 Adjustment 176 ...
Страница 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Страница 204: ...4 5 6 7 8 9 7 Installation 196 ...
Страница 205: ...10 7 Installation 197 ...
Страница 210: ...11 NOTE Keep the parts as illustration above Installation of Buffer Pass Unit 1 7 Installation 202 ...
Страница 223: ...2 3 2x 7 Installation 215 ...
Страница 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...