• Temperature is reduced by making wider sheet-to-sheet distance with the maximum 4 steps to control the temperature at
lower than the target temperature for normal print.
Fixing mode
Step
B4
LGL
B5
EXE
A4R
LTRR
A5R
B5R
EXE-R
Free size
Post
card
Enve-
lope
Plain paper
Thin paper
S-thin paper
Normal
13
27/25/20
17
17
13
---
---
1
13
27/25/20
17
17
13
---
---
2
10
27/25/20
14
14
10
---
---
3
8
10
10
10
8
---
---
4
4
4
4
4
4
---
---
Heavy paper
Heavy-H pa-
per
Normal
11
23/20
13
13
4
---
---
1
11
23/20
13
13
4
---
---
2
10
23/20
13
13
4
---
---
3
8
10
10
10
4
---
---
4
4
4
4
4
4
---
---
Bond paper
Normal
8
8
8
8
8
---
---
1
8
8
8
8
8
---
---
2
8
8
8
8
8
---
---
3
8
8
8
8
8
---
---
4
4
4
4
4
4
---
---
OHP
Normal
13
27/25/20
17
17
13
---
---
1
13
27/25/20
17
17
13
---
---
2
10
27/25/20
14
14
10
---
---
3
8
10
10
10
8
---
---
4
4
4
4
4
4
---
---
Postcard
Normal
---
---
---
---
---
12
---
1
---
---
---
---
---
10
---
2
---
---
---
---
---
8
---
3
---
---
---
---
---
8
---
4
---
---
---
---
---
4
---
S-Postcard
Normal
---
---
---
---
---
6
---
1
---
---
---
---
---
5
---
2
---
---
---
---
---
4
---
3
---
---
---
---
---
4
---
4
---
---
---
---
---
2
---
Envelope
Normal
---
---
---
---
---
---
10
1
---
---
---
---
---
---
8
2
---
---
---
---
---
---
6
3
---
---
---
---
---
---
6
4
---
---
---
---
---
---
3
Completion conditions:
• When the fixing temperature reaches 175 deg C and lower for 430 msec continuously after shifting to the third or fourth step,
the productivity returns to the second step.
Normal
1st Step
2nd Step
3rd Step
4th Step
235deg C, 430msec
Return
175deg C,430msec
245deg C, 430msec
255deg C, 430msec
275deg C, 430msec
2. Technical Explanation
72
Содержание imageRUNNER 2525 Series
Страница 1: ...Revision 9 0 imageRUNNER 2530 2525 2520 Series Service Manual ...
Страница 16: ...Product Overview 1 Product Lineup 7 Features 10 Specifications 11 Name of Parts 15 Operation 18 ...
Страница 62: ...No Part name 3 Laser unit 2 Technical Explanation 52 ...
Страница 119: ...Periodical Service 3 Consumable Parts and Cleaning Parts 110 Cleaning Parts 115 ...
Страница 125: ...Cleaning Parts Fixing guide Transfer guide 3 Periodical Service 115 ...
Страница 136: ...List of Sensors S18 S17 S16 TS2 HU1 S9 S8 S19 TS1 S11 S12 4 Disassembly Assembly 126 ...
Страница 165: ...5 Remove the idler gear 1 claw 1x 4 Disassembly Assembly 155 ...
Страница 172: ... 1 4 2 3 2 2 Remove the scanner motor 4 screws 4x 4 Disassembly Assembly 162 ...
Страница 186: ...3 Remove the RAM PCB Release the hook 4 Disassembly Assembly 176 ...
Страница 187: ...Adjustment 5 Overview 178 Basic Adjustment 180 Adjustment when Replacing the Parts 182 ...
Страница 209: ...Error Jam Alarm 7 Outline 200 Error Code 201 Jam Code 213 Alarm Code 219 ...
Страница 223: ...Jam Code Main Unit 550 sheet 1st cassette model S1 S5 S7 S19 S12 S42 S40 7 Error Jam Alarm 213 ...
Страница 231: ...Service Mode 8 Overview 222 Details of Service Mode 225 Remote UI Service Mode 302 ...
Страница 314: ...Example of report display 8 Service Mode 304 ...
Страница 387: ...APPENDICES Service Tools 378 General Circuit Diagram 379 ...