
2
2
2-78
2-78
Technical Reference > Embedded RDS > E-RDS Setup > Steps to E-RDS settings
Technical Reference > Embedded RDS > E-RDS Setup > Steps to E-RDS settings
5. Perform installation or deletion of the CA certificate if necessary, and reboot the device.
• Installation of the CA certificate: Perform installation from SST.
• Deletion of the CA certificate: When the following operation is performed, the CA certificate
in the factory setting is automatically installed.
1) Select [NETWORK GR.] > [CA-KEY] > [CLEAR] and press [OK] or [ ] button to
display Confirm Clear screen. Select [Yes] and press [OK] button.
NETWORK GR.
CA-KEY
JOB SERIALIZE
BUFFER LIMIT
E-RDS
S
CA-KEY
CLEAR
S
Excute?
No
Yes
S
2) Reboot the device.
6. Activate [SERVICE MODE]. (See 1. for the procedure.)
7. Select [NETWORK GR.] > [E-RDS] > [E-RDS SWITCH] and press [OK] or [ ] button.
E-RDS
COM-TEST
E-RDS SWITCH
RGW-ADDRESS
RGW-PORT
S
8. Select [On] and press [OK] button.
NOTE:
This operation enables the communication function with UGW.
E-RDS SWITCH
Off
On
S
Settings changed.
S
9. Press [Back] or [ ] button to go back to E-RDS Setup menu.
F-2-160
F-2-161
F-2-162
CAUTION:
The following settings i.e. RGW-PORT and RGW-ADDRESS in Service mode must not
be change unless there are specific instructions to do so.
Changing these values will cause error in communication with UGW.
RGW-ADDRESS
U/D Keys: Adjust Value
Keys: Move Cursor
R/L
https://a01.ugwdevic
RGW-PORT
(1-65535)
443
S
10. Select [COM-TEST] and press [OK] or [ ] button to display Confirm Communication Test
screen. Select [Yes] and press [OK] button.
NOTE:
This initiates the communication test between the device and the UGW.
E-RDS
COM-TEST
E-RDS SWITCH
RGW-ADDRESS
RGW-PORT
S
Executing...
S
Excute?
No
Yes
S
If the communication is successful, “Done.” is displayed. If “Could not execute.” (failed)
appears, refer to the “Troubleshooting“ and repeat until “Done.” is displayed.
Done.
S
NOTE:
The communication results with UGW can be distinguished by referring to the
communication log. By performing the communication test with UGW, E-RDS acquires
schedule information and starts monitoring and meter reads operation.
F-2-163
F-2-164
Содержание Color imageRUNNER LBP5280
Страница 4: ...Blank Page ...
Страница 216: ...5 5 5 19 5 19 Troubleshooting Error Code Jam Code Troubleshooting Error Code Jam Code ...
Страница 276: ... General Timing Chart General Circuit Diagram Signal Input Output List Appendix ...
Страница 283: ...6 8 6 8 Appendix Backup Data Appendix Backup Data ...
Страница 284: ...6 9 6 9 Appendix Backup Data Appendix Backup Data ...