330
322
*
A
B
120 min
C max
27,5
150 min
(°)
310 max
p.
9
- M
an
u
al
FA
0
0
9
9
5
-E
N
- 0
1/
2
0
18 - © C
A
M
E S
.p.
A
. -
Tr
ansla
tio
n of t
he o
riginal inst
ru
ct
io
ns
Leaf opening arc (°)
A
B
C max
90
140
420
150
90
160 ÷ 180
380
150
110
200 ÷ 220
400
50
POST BRACE
GATE BRACE
Checking measurements and applicative dimensions
Establish where you will fit the gate brace and measure where the gate-post brace will fit. Make sure to respect
the quotas shown in the drawing and table.
Preliminary operations
Fit junction boxes and corrugated tubing needed for the incoming connections from the distribution pit.
The number of tubes depends on the type of system and the accessories you are going to fi t. You need to set
up at least two corrugated tubes where the operator will be installed (
*
on the gate leaf that opens fi rst).
Содержание 801MB-0080
Страница 2: ...1 2 3 1 2 3 ...
Страница 33: ...Swing gate operator FTL20DGC INSTALLATION MANUAL EN English FA00995 EN ...
Страница 34: ...1 2 3 1 2 3 ...
Страница 65: ...Automatismes pour portails battants FTL20DGC MANUEL D INSTALLATION FR Français FA00995 FR ...
Страница 66: ...1 2 3 1 2 3 ...
Страница 97: ...Автоматика для распашных ворот FTL20DGC РУКОВОДСТВО ПО УСТАНОВКЕ RU Русский FA00995 RU ...
Страница 98: ...1 2 3 1 2 3 ...