iNetVu New Generation Service Manual
Page 45 of 53
C-COM Satellite Systems Inc.
18.
Install top level assembly on top of Base Bearing assembly ensuring to line up Chassis holes
with those on the Bearing.
19.
Apply thread locker and fasten screws loosely until all have been inserted. Once all screws
are inserted fasten as per torque table which can be found at end of this article.
20.
Slide belt onto AZ Reducer Shaft. Belt at the back end should be above Pulley for easy
installation.
21.
Slide belt onto Pulley, ensure belt teeth align in grooves on the Pulley.
AZ
Reducer
Shaft
Belt
Pulley