iNetVu New Generation Service Manual
Page 25 of 53
C-COM Satellite Systems Inc.
5.
Insert the (4) bottom screws on the clamp plate closest to the EL motor but do not fully tighten.
All (4) screws on that clamp plate should be loose until tension is set on the belt.
6.
Insert and tighten the remaining (4) screws from the EL Pulley Clamp farthest from the
elevation motor.
7.
Set the belt tension by adjusting the tensioning screw. Set the tension on the Pulley belt to 485
±24 Hz for the 1201, and 330 ±10 Hz for the 755/981/985 Platforms.
8.
To complete the replacement tighten the (4) bottom screws closest to the elevation motor.
Tension Screw
Install (4) Screws
and tighten
Install (4) Screws
but do not tighten