
iNetVu New Generation Service Manual
Page 43 of 53
C-COM Satellite Systems Inc.
12.
Slide belt up off the pulley and disengage at the front end of AZ motor gear shaft, as second
person continues to support mount.
13.
Lift top level assembly off base assembly leaving Pulley and Bearing assembly.
14.
Remove faulty/old AZ Base Bearing assembly and place new AZ Base Bearing (replacement
part) assembly on parent base assembly.