33
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
PARTS / INTERVAL
1 - 2
DAYS
EVERY
WEEK
15 DAYS 60-90 DAYS
EVERY
SEASON
Clean the burner
•
·
Clean the ash collection
compartment with a vacu-
um cleaner
·
Clean the ash pan
·
Clean the hearth door and
glass
·
Clean the turbulators
·
Clean the lower ash pan
·
Clean the “T” еhaust fit-
tings (outside the boiler)
·
Clean the exchangers and
remove ash incrustation
·
Clean the chimney
·
Circulation pump inspec-
tion
·
Hudraulic leaks inspection
·
Door dasket incpection
·
Start-up spark plug inspec-
tion
·
Door clousure operation
·
•
With poor quality pellets cleanning frequency must be increased.
Таble 9.
Table
For operation and services of pellet boiler Pell Easy
Содержание Pell Easy 20
Страница 2: ...2 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 26: ...26 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 28: ...28 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE 10 2 Controller Menus ...
Страница 29: ...29 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 30: ...30 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 31: ...31 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 46: ...46 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 47: ...47 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 48: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...