25
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
- The inner revision cover is fixed with
four “ear” nuts (2 on each side, pointed in
scheme 14). Unmount them to loose the
cover.
Diagram 15
- Pull up carefully the revision cover
altogether with resistance spirals.
Remove the cover from the boiler.
Diagram 16
- After the revision cover is removed,
clean well the ash over the pipes and the
inner surface of the boiler by using brush
and vacuum cleaner. Make sure that
the lower pipe parts on the bottom are
also well cleaned, as it is the most ash
collecting part.
Diagram 17
Содержание Pell Easy 20
Страница 2: ...2 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 26: ...26 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 28: ...28 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE 10 2 Controller Menus ...
Страница 29: ...29 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 30: ...30 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 31: ...31 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 46: ...46 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 47: ...47 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 48: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...