24
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Attention! Make sure that no
flaming and smoldering pellets
ago clean with a vacuum cleaner
and temperature surfaces is less
than 40 ° C
9.3.1
Cleaning and maintenance of
suction fan
Diagram 11
Unmount the ash container as described
in the manual instruction.
Diagram 12
Unmount by using the “+” screwdriver the
four screws size M5. After that unmounts
the revision cover.
Diagram 13
After the revision cover is unmounted,
there is direct access to the fan turbine.
Do detailed cleaning by using brush and
vacuum cleaner of the ash on the fan
turbine as well as the zone around it. After
the zone is well cleaned, put the revision
cover back and clamp well the four screws
size M5.
9.3.2
Cleaning and maintenance of
the Fume exhaust tube
Diagram 14
-Open the front revision cover, pointed in
scheme 14.
Содержание Pell Easy 20
Страница 2: ...2 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 26: ...26 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 28: ...28 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE 10 2 Controller Menus ...
Страница 29: ...29 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 30: ...30 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 31: ...31 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 46: ...46 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TE ...
Страница 47: ...47 AL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL ...
Страница 48: ...ISO 9001 2008 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg ...