7
L.
Install Burner Swing Door (BSD) on Block Assembly
hinges, see Figure 31. Move BSD to front of boiler.
Position door on the Floor, standing up, perpendicular
to front of boiler (full open position).
Figure 1: Install Burner Swing Door
Figure 0b: Install Jacket Top Panels
- Viewed From Rear
Figure 0c: Install Jacket Rear
Top Panel -
Viewed From Rear
step 2.
On 8 thru 18 section boilers, locate
intermediate top panel(s) and install in order of
assembly shown in Table XI. Position panel
between outer top corner panes. Slide forward
to engage locking tabs into slotted openings on
previously installed panel, see Figure 30b. Secure
rear flange with two (2) #8 x ½” lg SMS. Repeat
until intermediate panels reach supply manifold.
step 3.
Position jacket rear top panel between outer
top corner panels behind supply manifold. Slide
forward until locking tabs are engaged into slotted
openings on previously installed panel. Secure
panel to rear clips on outer corner panels with two
(2) #8 x ½” lg. SMS. Refer to Figure 30c.
Содержание MPC
Страница 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Страница 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Страница 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Страница 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Страница 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Страница 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Страница 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Страница 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Страница 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Страница 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Страница 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Страница 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Страница 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...
Страница 98: ...98 Figure 64 MPC Standard 50 PSI Trim Control with 30 PSI and 80 PSI Working Pressure Trim Options ...
Страница 100: ...100 Figure 64 MPC Standard 50 PSI Trim and Control with 30 PSI and 80 PSI Working Pressure Trim Options continued ...
Страница 102: ...102 Figure 65 MPC Optional Controls ...