![Burnham MPC Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/burnham/mpc/mpc_installation-and-operation-manual_2832959036.webp)
6
Figure : Lower Tie Bar Installation
Repeat operation until all vertical channels have
been installed. Using an open end wrench and
ratchet with socket, tighten all 5/8” bolts and nuts to
secure frame brackets to casting legs.
13. Locate Jacket Carton(s), marked ‘JC-2’ and remove
contents. Install lower tie bars into slotted ‘I’
openings on lower frame brackets to provide proper
spacing between frame channels, refer to Figure 22.
Determine proper location of tie bar by comparing
it’s length to the distance between brackets. Lay
each tie bar on the floor at that location along both
sides of boiler.
Step a
. Starting at the rear and working to the front,
hold the first tie bar on a slight angle and pass the
end through ’I’ opening in rear bracket as shown
in Figure 22.
step b.
Lower the tie bar between brackets as
shown in Figure 22.
step c.
Pull tie bar back and engage opposite end
through ‘I’ opening in front or center section
bracket as shown in Figure 22.
step d.
Engage slotted end of hook over lip of ‘I’
opening and push downward to lock position.
If necessary, spread brackets by pushing or
pulling vertical channels until tie bar drops into
locking position, see Detail ‘A’ in Figure 22. For
multiple tie bars, each consecutive bar must be
rotated end for end so the top flanges oppose
each other, for entry into ‘I’ opening, see Detail
‘B’ in Figure 22. Complete process to front
bracket and repeat on opposite side.
Содержание MPC
Страница 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Страница 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Страница 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Страница 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Страница 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Страница 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Страница 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Страница 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Страница 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Страница 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Страница 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Страница 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Страница 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...
Страница 98: ...98 Figure 64 MPC Standard 50 PSI Trim Control with 30 PSI and 80 PSI Working Pressure Trim Options ...
Страница 100: ...100 Figure 64 MPC Standard 50 PSI Trim and Control with 30 PSI and 80 PSI Working Pressure Trim Options continued ...
Страница 102: ...102 Figure 65 MPC Optional Controls ...