![Burnham MPC Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/burnham/mpc/mpc_installation-and-operation-manual_2832959008.webp)
8
TABLE OF CONTENTS
SECTION I - GENERAL INFORMATION
Dimensional Information ................................................................................................................. 10
Ratings/Data ....................................................................................................................................... 1
Locating the Unit . ............................................................................................................................. 1
Air Supply/Venting ............................................................................................................................. 1
SECTION II - CAST IRON BLOCK ASSEMBLY INSTRUCTIONS (Knockdown Boiler)
Knockdown Boiler w/ Factory Assembled Section ........................................................................ 17
Assembly of Sections, Manual Draw-up ........................................................................................ 18
Assembly of Sections, Hydraulic Draw-up ....................................................................................
Hydrostatic Test ................................................................................................................................
SECTION III - BOILER ASSEMBLY INSTRUCTIONS (Knockdown Boiler)
Install Common Parts to Block (Hinge Hardware, Flue Collector, Clean-out Covers, Etc.) ...... 5
Install Supply and Return Manifolds .............................................................................................. 7
Install Return Water Mixing Tube ..................................................................................................... 7
Install Jacket Support Frame to Block ............................................................................................ 0
Install Heat Exchanger Insulation .................................................................................................... 7
Install Internal Wiring Harness Components ................................................................................. 8
Install Jacket Top Corner Panels ....................................................................................................
Install Jacket Front and Rear Panels ..............................................................................................
Install Jacket Top and Side Panels . ................................................................................................ 5
Install Burner Swing Door (BSD) .................................................................................................... 7
Install
nd
and
rd
Pass Flueway Baffles
........................................................................................... 9
Procedure to Close and Secure Burner Swing Door ..................................................................... 50
Install Burner Adapter Plate and Mount Burner (Burner Specific)
............................................... 50
Connecting Internal Wiring Harness to Burner Controls .............................................................. 51
Install Standard Water Trim and Control ......................................................................................... 5
Install Optional Controls:
• Probe LWCO ............................................................................................................................. 5
• High Limit Control w/ Manual Reset ...................................................................................... 5
• Low Fire Hold Control ............................................................................................................. 5
• Low / High / Low Control or Modulating Control .................................................................. 55
Install Flue Outlet Damper Assembly .............................................................................................. 56
Install Optional Burner Swing Door Cover Split Jacket Panels .................................................... 57
SECTION IV - INSTALLATION INSTRUCTIONS
Packaged Boiler - Shipping Information ......................................................................................... 58
Boiler Piping - Heating Applications................................................................................................ 58
Boiler Piping - Domestic Hot Water ................................................................................................. 6
Relief Valve Piping ............................................................................................................................. 6
Electric Wiring ................................................................................................................................... 6
SECTION V - OPERATING INSTRUCTIONS
Filling System .................................................................................................................................... 65
Adjusting Controls ............................................................................................................................ 65
Adjusting Burner ............................................................................................................................... 65
Test Controls ...................................................................................................................................... 66
Initial Cleaning, Water Boilers .......................................................................................................... 66
Frequent Water Addition
................................................................................................................... 67
Oxygen Corrosion ............................................................................................................................. 67
Содержание MPC
Страница 19: ...19 Figure 5 Manual or Hydraulic Draw up Section Assembly ...
Страница 28: ...28 Table VII Modular Return Water Mixing Tube RWMT RC ...
Страница 29: ...29 Figure 13 Return Water Mixing Tube RC Assembly and Installation ...
Страница 78: ...78 Figure 56 MPC Common Bare Boiler Components ...
Страница 80: ...80 Figure 56 MPC Common Bare Boiler Components continued ...
Страница 82: ...82 Figure 57 MPC Front Center Section Frame Rail Assembly ...
Страница 84: ...84 Figure 58 MPC Rear Section Frame Rail Assembly ...
Страница 86: ...86 Figure 59 MPC Return Water Mixing Tube RC Assembly ...
Страница 88: ...88 Figure 60 MPC Heat Exchanger Insulation Wrapper ...
Страница 90: ...90 Figure 61 MPC Internal Wiring Harness Components ...
Страница 92: ...92 Figure 62 MPC Jacket Panel Assembly ...
Страница 94: ...94 Figure 62 MPC Jacket Panel Assembly continued ...
Страница 96: ...96 Figure 63 MPC 2 nd and 3 rd Pass Flueway Baffles ...
Страница 98: ...98 Figure 64 MPC Standard 50 PSI Trim Control with 30 PSI and 80 PSI Working Pressure Trim Options ...
Страница 100: ...100 Figure 64 MPC Standard 50 PSI Trim and Control with 30 PSI and 80 PSI Working Pressure Trim Options continued ...
Страница 102: ...102 Figure 65 MPC Optional Controls ...