Chapter 5: Advanced Serverboard Setup
5-7
Socket key
CPU installed in socket
PnP cap released
from load plate
CPU key
CPU pin 1
Notched corner
Gold dot
Load lever
With the CPU in the socket, in-
spect the four corners of the CPU
to make sure that it is properly
installed.
Use your thumb to gently push the
load lever down until it snaps into
the retention clasp.
If the CPU is properly installed
into the socket, the PnP cap will
be automatically released from the
load plate when the lever locks.
Remove the cap. Repeat steps to
install a second CPU if desired.
Warning!
Keep the plastic PnP cap.
The serverboard must be shipped with
the PnP cap properly installed to protect
the CPU socket. Shipment without the
PnP cap properly installed will void the
warranty.
7.
8.
9.
Содержание NovaScale R423
Страница 1: ...NovaScale R423 Installation and User s Guide NOVASCALE REFERENCE 86 A1 95EW 00...
Страница 2: ......
Страница 10: ...Notes viii NovaScale R423 Installation and User s Guide...
Страница 16: ...1 6 NovaScale R423 Installation and User s Guide...
Страница 21: ...Chapter 2 Server Installation 2 5 Figure 2 1 Installing Chassis Rails...
Страница 23: ...Chapter 2 Server Installation 2 7 Figure 2 2 Installing the Server into a Rack...
Страница 25: ...Chapter 2 Server Installation 2 9 Figure 2 3 Accessing the Inside of the System...
Страница 30: ...NovaScale R423 Installation and User s Guide 3 4 Notes...
Страница 60: ...5 26 NovaScale R423 Installation and User s Guide Notes...
Страница 100: ...A 6 NovaScale R423 Installation and User s Guide Notes...
Страница 106: ...B 6 NovaScale R423 Installation and User s Guide Notes...
Страница 140: ...E 4 NovaScale R423 Installation and User s Guide Notes...
Страница 143: ......
Страница 144: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 95EW 00...