![Buhnen HB 5010 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/buhnen/hb-5010/hb-5010_translation-of-the-original-operating-manual_2828284074.webp)
Installation
16
Wrong
Right
Bundling or laying the hoses with contact will lead to
overheating at these contact sites.
Lay these hoses far enough apart.
Squeezing the hoses caused by brackets can
damage the hoses.
Select the bracket with the matching diameter.
Tighten the bracket enough so that the hose is
secured but not squeezed.
Содержание HB 5010
Страница 10: ...2...
Страница 14: ...Special security advice 6...
Страница 16: ...Technical data 8 Figure 2 1 2 Location of type plate on the inside of the unit...
Страница 28: ...Operation 20...
Страница 40: ...Operation 32...
Страница 57: ...Repairs 49...
Страница 60: ......
Страница 62: ...Table of Contents 4 Table of contents...
Страница 64: ...Specific security advice 6...
Страница 68: ...Technical Data 10...
Страница 76: ...Maintenance 18...
Страница 80: ......
Страница 82: ...4 Inhaltsverzeichnis...
Страница 84: ...Specific safety instructions 6...
Страница 90: ...Construction and function 12...
Страница 92: ...Technical data 14...
Страница 104: ...What happens if 26...
Страница 107: ...Accessories 29...
Страница 110: ...Ersatzteillisten...
Страница 115: ...Spare parts list 3 1 HB 5010 Tank System basic unit Fig 1 1 Spare parts for basic unit Part 1...
Страница 128: ...Spare parts list 16 2 3 Spare parts bead and spray 19 9 Fig 2 11 Grip casing both versions...
Страница 129: ...Spare parts list 17 11 Fig 2 12 Heat insulation half shell both versions...
Страница 130: ...18 Spare parts list 10 Fig 2 13 Trigger and mounting parts both versions...
Страница 133: ...Table of contents 21...
Страница 136: ...Table of Contents 2...
Страница 138: ...4...