Index
14
Logano GB125 oil condensing boiler - Technical specifications are subject to change without prior notice.
64
14 Index
A
Add water
. . . . . . . . . . . . . . . . . . . . . . 57
B
Back panel cover
. . . . . . . . . . . . . . . . . . 54
Boiler output
. . . . . . . . . . . . . . . . . . . . 8
Boiler section feet
. . . . . . . . . . . . . . . . . 25
Boiler size
. . . . . . . . . . . . . . . . . . . . 8
C
Carbon dioxide content
. . . . . . . . . . . . . . . 8
Checking the operating pressure
Checking the position of the hot gas baffle plates
Cleaning brush
. . . . . . . . . . . . . . . . . . . 55
Cleaning cover
. . . . . . . . . . . . . . . . . . . 54
Cleaning the hot gas flues
Commissioning
. . . . . . . . . . . . . . . . . . . 38
Connecting the DHW cylinder
Connecting the heating flow and return
Connecting the safety flow
Connections
. . . . . . . . . . . . . . . . . . . . 8
Converting the burner door to l.h. closing
D
Declaration of Conformity
Dirt trap
. . . . . . . . . . . . . . . . . . . . . . . 31
Disposal
. . . . . . . . . . . . . . . . . . . . . . 6
Draught
. . . . . . . . . . . . . . . . . . . . . . . 8
E
Emergency stop switch – heating system
F
Fitting boiler drain & fill valve
Fitting sections of the casing
Fitting the adjustable feet
Fitting the return connector
Flow temperature
. . . . . . . . . . . . . . . . . . 8
Flue gas connection
. . . . . . . . . . . . . . . . 26
Flue gas mass flow rate
Flue gas temperature
. . . . . . . . . . . . . . . . 8
Fuel oil viscosity
. . . . . . . . . . . . . . . . . . 12
Fuels
. . . . . . . . . . . . . . . . . . . . . . . . 9
H
Heat exchanger system
. . . . . . . . . . . . . . 54
Heating circuit quick installation system
I
Installation location
. . . . . . . . . . . . . . . . . 6
Installing a boiler plinth
. . . . . . . . . . . . . . . 25
Installing the burner cover
M
Main shut-off facility
. . . . . . . . . . . . . . . . 39
Main shut-off valve
. . . . . . . . . . . . . . . . . 39
Maintenance interval
. . . . . . . . . . . . . . . . 47
Maintenance work
. . . . . . . . . . . . . . . . . 60
Maintenance, demand-dependent
Making the power supply connection
O
Operating Conditions
. . . . . . . . . . . . . . . . 10
Operating pressure, permissible
Original parts
. . . . . . . . . . . . . . . . . . . . 5
P
Power supply voltage
. . . . . . . . . . . . . . . 12
Pump run-on time
. . . . . . . . . . . . . . . . . 49
R
Rated output
. . . . . . . . . . . . . . . . . . . . 8
Removing the boiler cover
Removing the burner cover
Removing the burner door casing
Removing the hot gas baffle plates
Replacing the packing cord
Report, commissioning
. . . . . . . . . . . . . . 42
Reports, inspection and maintenance
Reversing the burner door
S
Sensor curves
. . . . . . . . . . . . . . . . . . . 63
Shutting down
. . . . . . . . . . . . . . . . . . . 50
Siphon
. . . . . . . . . . . . . . . . . . . . 30
Site test pressure
. . . . . . . . . . . . . . . . . 12
Specification
. . . . . . . . . . . . . . . . . . . . 8
T
Temperature sensor curves
Tools
. . . . . . . . . . . . . . . . . . . . . . . . 6
Transportation with a boiler/sack trolley
W
Wall clearances
. . . . . . . . . . . . . . . . . . 22
Wet cleaning
Содержание Logano GB125
Страница 65: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 65...
Страница 66: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 66...
Страница 67: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 67...