Heating system inspection and maintenance
11
Logano GB125 oil condensing boiler - Technical specifications are subject to change without prior notice.
58
11.9 Inspection and maintenance reports
B
Sign and date the completed inspection work.
The inspection and maintenance reports are also desig-
ned as templates and may be photocopied.
Inspection work
Page Date:______
Date:______
Date:______
1. Check the general condition of the heating system
2. Visual inspection and function check of the heating system
3. Check the gas and water-carrying components of the system for:
– Leaks during operation
– Tightness test
– Visible signs of corrosion
– Signs of ageing
4. Check the combustion chamber and heating surface for contami-
nation; shut down the system for this step
5. Check the condensing heat exchanger system for the following:
– Contamination
– Damage or hardening of gaskets.
6. Check the burner (
7. Check the combustion air supply and flue gas pipe for:
– Function and safety
– Blockages in the ventilation air system
– In the case of a concentric combustion air supply and flue gas pi-
pe, check for blockages in the condensed water discharge
– Clean the condensate drain and siphon.
8. Check the expansion vessel pre-charge pressure
9. Check the function of the DHW cylinder and corrosion protection
anode (
10. Check the control unit settings (
11. Final check of inspection work including recording readings taken
and test results
Confirm professional inspection
Company
stamp/
signature
Company
stamp/
signature
Company
stamp/
signature
Содержание Logano GB125
Страница 65: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 65...
Страница 66: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 66...
Страница 67: ...Notes Logano GB125 oil condensing boiler Technical specifications are subject to change without prior notice 67...