13
System inspection and maintenance
Logano G315 – 6 720 817 939 (2017/02)
37
Additional maintenance work as-needed
Page
Date:____________
Date:____________
1.
Shut down the heating system
2.
Remove and clean flue gas baffles
3.
Clean the flue gas passages (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the draft diverter
6.
Insert the flue gas baffles
7.
Check gaskets/sealant ropes on the burner and burner door and
replace if required (see burner documentation)
8.
Commissioning the heating system
9.
Record the final checks of the maintenance work, incl.
measurements and test results
10.
Check safe and proper operation
Confirm professional inspection
Company stamp/
signature
Company stamp/
signature
Table 15
Date:____________
Date:____________
Date:____________
Date:____________
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Table 16
Содержание Logano G315
Страница 55: ...Appendix Logano G315 6 720 817 939 2017 02 55 ...
Страница 56: ......