9
Installing a control panel
Logano G315 – 6 720 817 939 (2017/02)
29
9.5
Wiring Hydrolevel Hydrostat with Beckett CF500 &
CF800 Burner
In applications requiring CSD-1 compliance a manual safety high limit
switch must be installed wired from L1 to terminal LMT Interrupting
power to the burner
Fig. 56 Wiring Hydrolevel with Beckett CF500/CF800 (for 120V burners only)
[1]
Hydrolevel Hydrostat
[2]
Becket CF500/CF800
L1
Line 1 power (hot)
L2
Line 2 power (neutral)
LMT
Limit control terminal
MTR
Motor control terminal
S1
Oil valve
S2
Oil valve (on cleancut pump)
TRANS
Ignition transformer
VLV
Valve control terminal
———
Factory Wiring
------
Wiring supplied by installer
L1 L2 C1 C2 B1 B2
I1
I2
Z
T
TV
L
B1 - L
B2 - N
N
120VAC
G
EQUIP
GND
TERMINAL
+
1
2
LIMITS
DETECTOR
A
K
D
A
A
C
F
LINE VOLTAGE SERVICE 120V 60Hz
FROM FUSED DISCONNECT SWITCH
SUPPLIED BY INSTALLER
OPERATOR
A
TRANS
S1
MOTOR
7505P
S2
A
D
LMT
L1
L1
IGN
TR
TW
VLV
CAD
CAD
MTR
L2
L2
B
B
6 720 817 939-10.1T
Содержание Logano G315
Страница 55: ...Appendix Logano G315 6 720 817 939 2017 02 55 ...
Страница 56: ......