5.3.20 Replacing the gas valve assembly
z
Disconnect the system from the power supply.
z
Close the gas shutoff valve.
z
Remove all plug-in cables from the gas valve assembly.
Note order of cable terminals.
z
Loosen the screw-in adapter on the tube connector.
z
Remove the valve assembly and replace with a new unit;
attaching it to the screw-in connection adapter.
z
Connect all plug-in cables in the correct order.
With the system running, check for leaks at all joints likely to
have been affected by the fitting of replacement parts.
5.3.21 Checking the wiring connection to the KIM
z
Disconnect the system from the power supply.
z
Check plugs and wiring connections to KIM
z
Connect system to mains power supply.
fig. 82 Gas valve assembly replacement (HONEYWELL valve
assembly shown as example)
CAUTION!
Work on gas pipes and fittings must only be
carried out by a registered service provider.
NOTE
Carry out all initial start-up tasks as indicated in
the installation and servicing instructions, and
complete the corresponding report form.
fig. 83 Checking the wiring connection to the KIM