Servicing
5
54
Installation and servicing instructions condensing gas boiler 800 - 24/29/43/60 and 800 - 24T25/29T25 H/V • edition 02/2006
Subject to modifications resulting from technical improvements !
Buderus • http://buderus-domestic.co.uk
5.3.15 Checking the hot surface ignitor
z
Disconnect the system from the power supply.
z
Unplug the hot surface ignitor.
z
Measure the resistance of the hot surface ignitor at the
plug. If the resistance is less than 200
Ω
, the hot surface
ignitor is in order.
z
Disconnect measuring device.
z
If the hot surface ignitor is working correctly, plug it in once
more.
z
Connect system to mains power supply.
5.3.16 Replacing the hot surface ignitor
z
Disconnect the system from the power supply.
z
Disconnect the plug-in cable.
z
Loosen fixing screws and remove hot surface ignitor.
z
Fit new hot surface ignitor and retighten fixing screws.
z
Plug in cable connection.
z
Connect system to mains power supply.
5.3.17 Checking the hose connection between the gas-air
injector and gas-valve assembly
z
Check hose connection for tightness and for signs of
possible blockages or damage.
z
Check that the hoses are correctly fitted to P1.
Hose connection:
P1 + , to T-piece gas-valve assembly.
fig. 76 Checking the hot surface ignitor
fig. 77 Replacing the hot surface ignitor
fig. 78 Checking the hose connection between the gas-air injector
and gas-valve assembly (Honeywell gas units)