Initial start-up
2
Installation and servicing instructions condensing gas boiler 800 - 24/29/43/60 and 800 - 24T25/29T25 H/V • edition 02/2006
31
Subject to modifications resulting from technical improvements !
Buderus • http://buderus-domestic.co.uk
2.2.8
Fitting the boiler casing
z
Put the casing in place (fig. 42, item 1).
z
Close (fig. 42, item 2) and lock the clasps (fig. 42, item 3)
with the radiator key (fig. 42, item 4).
z
Turn in the screw (fig. 42, item 5).
z
Close the cover of the control panel (fig. 42, item 6).
Do not carry the casing by the clasps !
2.2.9
Handing over
After completing the installation and commissioning of the
system the installer should hand over to the householder by
the following actions:
z
Fill out the form at the end of this manual. This confirms
that the system is properly set up, installed and commis-
sioned and that it has been handed over in good working
order.
z
Hand the User Manual to the householder and explain
his/her responsibilities under the relevant national regula-
tions.
z
Explain and demonstrate the lighting and shutting down
procedures.
z
The operation of the boiler and the use and adjustment of
all system controls should be fully explained to the house-
holder, to ensure the greatest possible fuel economy
consistent with the household requirements of heating.
Advise the User of the precautions necessary to prevent
damage to the system and to the building in the event of the
system remaining inoperative during frosty conditions.
z
Explain the function and the use of the boiler heating
controls.
z
Explain the function of the boiler fault mode. Emphasise
that if a fault is indicated, the boiler should be turned off and
a registered local heating installer consulted.
z
Explain and demonstrate the function of time and temper-
ature controls, radiator valves etc., for the economic use of
the system.
fig. 42 Fitting the boiler casing
6
5
2
2
2
4
3
1