9 | Carrying out a determination
Büchi Labortechnik AG
78/106
Operation Manual K-365 Dist Line
9
Carrying out a determination
9.1
Preparing the instrument
Navigation path
➔
Precondition:
R
All commissioning operations have been completed. See Chapter 5 "Installation",
page 29
u
Set the On/Off master switch to On.
ð
The instrument is starting up.
u
Make sure that no defective sealings or glass parts are used.
u
Navigate to the
Home
menu according the navigation path.
u
Tap the
[READY]
button on the function bar.
ð
The instrument is heating up.
u
u
Install the sample tube. See Chapter 8.8 "Installing the sample tube", page 72
u
Close the protection shield.
u
Flush the tubing. See Chapter 8.13 "Dosing manually", page 74
u
Aspirate the receiving and the sample vessels. See Chapter 8.14 "Aspirating
manually", page 75
9.2
Starting a determination
Navigation path
➔
Precondition:
R
The instrument is prepared. See Chapter 9.1 "Preparing the instrument",
page 78
R
The sample is prepared.
R
The connected instruments are prepared (MultiDist T only). See related
documentation.
u
Navigate to the
Home
menu according the navigation path.
u
Press the
[PREP]
button on the function bar.
ð
Wait until the status bar shows the status READY.
u
Select the operation mode. See Chapter 8.12 "Selecting the operation mode",
page 74
u
Tap the
[START]
button on the function bar.