5 | Installation
Büchi Labortechnik AG
38/106
Operation Manual K-365 Dist Line
u
Attach the metal plate to the magnetic area of
the instrument.
u
Push the cable through the rear cable duct.
u
Connect the sensor cable to the related
connection on the instrument. See Chapter 3.2
"Configuration", page 14
5.19
Installing the stirrer (MultiDist only)
u
Attach the stirrer to the receiving vessel.
u
Push the cable through the rear cable duct.
u
Connect the sensor cable to the related
connection on the instrument. See Chapter 3.2
"Configuration", page 14