Büchi Labortechnik AG
Installation | 5
Operation Manual K-365 Dist Line
33/106
u
Moist the hose.
u
Insert the inlet hose through the opening of the
cap nut and the screw cap of the water tank.
u
Submerse the inlet hose into the water.
5.9
Installing NaOH supply (MultiDist, MultiDist T only)
u
Install the inlet hose onto the connection
marked NaOH Sample Tube IN.
u
Attach the inlet hose in place with a hose clip.
u
Moist the aspiration hose.
u
Push the hoses together.
20
m
m
u
Attach the hose grommet to the canister lid.
u
Submerse the inlet hose into the NaOH.
5.10
Installing H₃BO₃ supply (MultiDist, MultiDist T only)
u
Install the inlet hose to the connection marked
H₃BO₃ Receiving Vessel IN.
u
Attach the inlet hose in place with a hose clip.