Medium voltage switchgear QMT
67
Installa
tion manual
3.5
Operation sequences for BMR modules
Before executing any operation for putting into service or for module access it is necessary
to respect the current safety standards for electrical work.
CAUTION: in these kind of modules all the panels are removable thanks to a tool; it is necessary
to ensure that the module is voltage free in the section where the access is done and to respect
the operation sequences written on module nameplate
The incoming cable compartment situated in the
lower part (see Pict. 46 marked with A) remains energized
even when the switch is earthed!
OPERATIONS
For this type of modules see the operating sequences on the front of switchboard.
Fig. 46
A
Содержание QMT Series
Страница 1: ...Y4419D 01GF 18W12 QMT Manuale installatore Installation manual ...
Страница 2: ...2 IT UK ITALIANO 3 ENGLISH 45 QMT ...
Страница 15: ...Quadri Media Tensione QMT Manuale installatore 15 Tipo 2 Tipo 3 Tipo 4 ...
Страница 44: ......
Страница 57: ...Medium voltage switchgear QMT 57 Installation manual Type 2 Type 3 Type 4 ...
Страница 86: ...86 Notes ...
Страница 87: ...87 ...