Lenox® Lockers (includes Cubby & “Z” Lockers)
Installation
2
10/24/07
Bradley Corporation • LK-INSTR-001 Rev. K; EN 07-1303
Table of Contents
Pre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Hardware List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Locker Base Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Corner Filler Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Locker Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6–8
Slope Top Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9–10
Flat Top Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11–12
End Panel Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Back-to-back Locker Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13
Back-to-back Slope Top Installation . . . . . . . . . . . . . . . . . . . . . . . .14–15
Island End Panel Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15
Pre-Installation Information
Check Contents
Separate all parts from packaging materials and ensure you have all parts required for installation. If
any parts are missing, do not attempt to install your Lenox® Lockers until you obtain all parts.
Supplies required
For lockers with no base, you will need floor anchors and appropriate hardware suitable for your
application. For optional fillers, you will need blocking (for support) and suitable fasteners.
Tools required
• Tape measure
• Power drill
• 9/32" drill bit
• Phillips driver bit
• Hammer drill (for drilling into concrete)
• Clamps
• 6' level and shims (for standard lockers)
• 3/16" masonry drill bit (minimum 6" long)
• Pop rivet gun (for number plates on standard lockers)
• Circular Saw
• Right-Angle Power Drill (for 12" wide and 12" deep lockers)
• OPTIONAL: chalk and/or string
Troubleshooting Tips
Properly installed lockers will need little adjustment. However, the following tips may be helpful:
• A chalk line drawn across the top of the locker banks will help provide a visual inspection. This is
only an aid and does not replace squaring and leveling the lockers.
• A string line along the top and bottom of the lockers may also be used to help in alignment.
• If shims are required after locker installation is complete, remove obstructive screws, apply the
shims then replace the screws.
• Avoid twisting the locker frames when applying shims.