Lenox® Lockers (includes Cubby & “Z” Lockers)
Installation
13
Bradley Corporation • LK-INSTR-001 Rev. K; EN 07-1303
10/24/07
Installation Instructions continued . . .
Step 9: Back-To-Back Locker Installation
NOTE: Back-to-back locker installation is similar to standard installation. The base sections must be
square and plumb prior to installing lockers.
1. Anchor the base sections to the floor using the hardware supplied (refer to Step 1 on page 4).
2. Fasten fillers to the corner lockers (refer to Step 2 on page 5).
3. Position, square and plumb the lockers onto the base, making sure locker tops and fronts are
flush. Temporarily clamp the adjoining locker sides together at the top and bottom. Drill four
9/32" holes through locker. The holes should be located 1-1/2" from the front of the locker and
evenly spaced from top to bottom (refer to Figures 3a and 3b on page 6 if necessary).
4. Drill four 9/32" holes through one adjoining locker back (see Figure 9). Fasten the lockers
together using the #10-24 male and #10-24 x 3/4" female sex bolts provided.
NOTE: Island locker installation requires floor mounting in addition to locker-to-locker attachment.
NOTE: For concrete floors, use a hammer drill with a six-inch long drill bit for pilot holes.
5. Drill a 3/16" pilot hole through the bottom of each locker into the floor. Use a drill with a six-
inch long drill bit. The holes should be located near the front of the locker. Drill a 9/32"
clearance hole through the bottom of each locker into the floor. Secure the lockers to the floor
with the Tapcon screws provided.
Figure 9
FILLER
9/32" DIA. CLEARANCE
HOLE THROUGH LOCKER
BOTTOM INTO FLOOR
NOTE: Drill 3/16" dia. pilot
hole through locker bottom
in concrete floor.
1/4" x 5" LG. TAPCON
SCREW (FAST-LF032)