12
Euro Style Restroom Partitions, Phenolic LT — FLOAT Series
Installation
12/10/2021
Bradley •
AD3-FLOAT_Install Rev. A
8 Installing Headrail
Insert the square finish flange over the front headrail .
A
Screw the mounting plate into the end thread on the
end of the headrail .
B
Insert the headrail into the upper holders and use the
set screws to attach the headrail onto the
holding blocks .
C
Use a rubber mallet to insert the end stopper into
the headrail .
D
When attaching the headrail, roughly adjust the door
clearances.