g265129
Figure 24
1.
Back cover
3.
Check the gap between the pintle chain and the
cleanout tray (
Note:
The chain should hang 2.5 to 5 cm (1 to
2 inches) above the cleanout tray.
g215001
Figure 25
1.
Gap between the pintle chain and the cleanout tray
4.
To adjust the tension, loosen the jam nuts on the
sides of the spreader (
).
g036955
Figure 26
1.
Take-up bolt
2.
Jam nut
5.
Turn the left take-up bolt clockwise 1 to 3
revolutions.
6.
Turn the right take-up bolt clockwise 1 to 3
revolutions.
7.
Check the chain tension, and repeat steps
and
until the desired tension is reached.
Note:
Do not overtighten the pintle chain as
it could lead to premature wear and spreader
failure.
8.
Tighten the jam nuts.
9.
Connect the power/ground cable and main
harness to the wire harness.
21
Содержание VBX 6500
Страница 31: ...Notes ...
Страница 32: ......