Notice
Working with automatically created measurement sheets is ex-
plained in chapter ‘
Setting up an online measurement [
}
92]
’.
4. Click ‘Finish’ when done.
5. Enter channel name and description.
6. Click ‘OK’ when done.
Assigning channels to the group adjustment
1. Double‐click on the created channel (e.g. ‘grp_adj_channel’) in the Project
Tree.
2. In the Main Area, an overview of the available adjustment channels opens.
3. To add measurement channel(s) to the group adjustment event, check the
‘Calibrate’ box of the desired channel(s).
Check box to add
channel to group
adjustment
Double-click
to open
group
adjustment
overview
The selected measurement channels are added to the group adjustment event.
Triggering the group adjustment
1. Connect the input pin to GND using a push‐button.
2. Make sure the pullup‐resistor is enabled, if you selected ‘active low’ trigger
polarity.
3. Double‐click on the input channel ‘grp_adj_channel’ of the group adjustment.
4. Download the configuration on the DDU 8. To connect the DDU 8 to Race‐
Con, see chapter ‘
Connecting the Unit to RaceCon [
}
18]
’.
5. Open a measurement sheet by clicking on the desired measurement sheet in
the Project Tree.
6. Drag the ‘grp_adj_channel’ and the ‘input_grp_adj_channel’ to the online
measurement sheet.
7. Press and release the push‐button.
8. The measurement labels indicate the state of the input pin and the state of
the adjustment.
11.4.3
11.4.4
11 | Online Measurement
100 / 160
DDU 8 Manual
Bosch Motorsport
Содержание DDU 8
Страница 1: ...Display DDU 8 Manual V1 2 9 16 2016 ...
Страница 6: ...Onboard Network Concept 3 3 Onboard Network Concept 6 160 DDU 8 Manual Bosch Motorsport ...
Страница 16: ...Mechanical Drawing 6 6 Mechanical Drawing 16 160 DDU 8 Manual Bosch Motorsport ...
Страница 158: ......
Страница 159: ......
Страница 160: ...Bosch Engineering GmbH Motorsport Robert Bosch Allee 1 74232 Abstatt Germany www bosch motorsport com ...