9 Further directories
Page
26
of
28
Original installation instructions Hyperion Lithium Ion Energy Storage
9
Further directories
9.1
Glossary
Term
Definition
BMS
battery management system
CHP
combined heat and power
damage
physical injury or damage to the health of persons, or damage to
property or the environment
hazard
potential source of damage
OCV
open current voltage: voltage without load on the battery
PPE
personal protective equipment
qualified personnel
an individual who, on the basis of his or her relevant professional
education, training and/or experience, is capable of identifying risks and
preventing hazards arising from the use of the product
thermal runaway
chemical process that is triggered by heat and generates additional heat.
user
individual who uses the product
9.2
List of tables
Table 5: Pin assignment of X2 for SMA SB Storage and Kostal PLENTICORE plus .. 24
Table 6: OCV at SOC Helios battery module and Hyperion system ....................... 25
9.3
List of figures
Figure 4: Modular batteries fixed to the grounding support ................................. 17
Figure 5: Connecting the modules to the BMS master with patch cables ............. 17
Figure 6: Power path with switching devices and BMS .......................................... 18
Figure 7: Connecting the SMA SB Storage to the BMZ Hyperion ........................... 19
Figure 8: Connecting the PLENTICORE plus to the BMZ Hyperion ......................... 20
Figure 9: Position of BMS master, DC-DC converter, relay and precharge resistor 24
Содержание Hyperion 15
Страница 1: ...ORIGINAL INSTALLATION INSTRUCTIONS Hyperion Lithium Ion Energy Storage ...
Страница 27: ......