3 Commissioning
Page
14
of
28
Original installation instructions Hyperion Lithium Ion Energy Storage
The modular batteries should be transported to the installation site in their original
packaging.
3.2.2
Choice of installation site
The battery system can be mounted upright on the floor or in a hanging position on
the wall.
It is recommended that the battery system be installed on the floor against a wall,
where the inverter can be mounted centrally above it. The inverter should be
mounted at least 20 cm above the battery system. At a distance of up to 30 cm, the
cables already attached to the Hyperion can be used.
Leave space of at least 30 cm free to the left and right of the battery system to get to
the DC disconnect switch to ensure sufficient air circulation.
To prevent the battery system from tipping over, it can be secured to the wall with
two screws (not supplied). Two fixing points are provided in the system housing for
this purpose.
Four fixing points are provided in the system housing for wall mounting. Since the
battery system can weigh up to 177 kg, it must be checked in advance whether the
wall and fastening material are suitable to support the load in the long term.
3.2.3
Mounting
The installation location for the battery system and the inverter have been
determined.
Recommended mounting:
5.
Install the wall bracket of the inverter.
6.
Hook the inverter into its bracket.
7.
Unscrew the cover of the connection area.
8.
If not already done, remove the cover
from the battery system housing:
Unscrew 2 screws (4 mm Allen key)
on the front underside.
Remove the cover from the base.
Position the base of the battery housing at the intended installation location (and
screw it on if necessary).
Modular batteries
Recommendation
Securing against
tipping over
Wall hanging
mounting
Requirement
Instructions
Screws M5
Содержание Hyperion 15
Страница 1: ...ORIGINAL INSTALLATION INSTRUCTIONS Hyperion Lithium Ion Energy Storage ...
Страница 27: ......