3 Commissioning
V1.2 | 06/08/2020
Page
17
of
28
6.
Use the patch cables to connect the BMS master (left of the two RJ45
sockets) with the installed modular batteries.
For example, refer to
7.
Connect the last module with the master’s left RJ45 socket (RJ45
-B).
3.3.2
Connect Helios modular batteries next to each other in series
WARNING
Electric shock from live parts.
Touching live components may cause electrical shock, which may
create intense heat or paralyse muscles. The latter can lead to
ventricular fibrillation, cardiac arrest or respiratory paralysis, or
death.
Never touch the contacts.
1.
Remove the safety cover of the "Power" sockets.
2.
Insert the power plug for the respective modular battery until it clicks
into place. For example, refer to
Figure 4:
Modular
batteries fixed to the
grounding support
Figure 5:
Connecting the
modules to the BMS
master with patch cables
X1
X2
X1
X2
X1
X2
X2
X1
X2
X1
X2
X1
Содержание Hyperion 15
Страница 1: ...ORIGINAL INSTALLATION INSTRUCTIONS Hyperion Lithium Ion Energy Storage ...
Страница 27: ......