3 Commissioning
Page
16
of
28
Original installation instructions Hyperion Lithium Ion Energy Storage
1.
Make sure that the DC disconnector of the Hyperion is set to "off".
2.
Loosen the two screws
H
and
I
, with which the downholder is fixed on
the left and right, and lift up the downholder.
3.
Unpack and insert the modular batteries.
NOTICE:
To ensure the best possible cooling; we recommend that the
modular batteries are inserted as in
With 3 Helios modular batteries
With 4 Helios modular batteries
With 5 Helios modular batteries
With 6 Helios modular batteries
4.
Screw the downholder to the right and left of the base of the system
housing.
5.
Screw each modular battery with two screws (M6) to the
downholder/grounding support.
For example, refer to
Instructions
Figure 3:
Insert 3 to 6
Helios modular batteries
I
H
Содержание Hyperion 15
Страница 1: ...ORIGINAL INSTALLATION INSTRUCTIONS Hyperion Lithium Ion Energy Storage ...
Страница 27: ......