OM-APEX E V1.06
November 19, 2012
Page 29
APEX CBT
MAINTENANCE
Your appliance has been manufactured in the Blaze King tradition of high quality. To ensure years of trouble free
operation, have your furnace serviced regularly by your Blaze King dealer.
Periodically during heating season thoroughly clean the chimney and fi rebox so your system is ready for next
fall. Inspect all fi rebricks and replace any damaged bricks. A broken fi rebrick should be replaced to prevent
warping of the fi rebox.
OPERATE THE ALTERNATE ELECTRIC, GAS OR OIL FURNACE PERIODICALLY TO ENSURE
THAT IT WILL OPERATE SATISFACTORILY WHEN NEEDED.
INSPECT VENT PIPES, VENT PIPE JOINTS AND VENT PIPE SEALS REGULARLY TO ENSURE
THAT SMOKE AND FLUE GASES ARE NOT DRAWN INTO, OR CIRCULATED BY, THE AIR
CIRCULATION SYSTEM.
ASHES
Ashes should be cleaned out when they reach a depth of 4” in the fi rebox (half way up the lower bricks).
Disposal of Ashes - Ashes should be placed in a metal container with a tight-fi tting lid. Th
e closed container of
ashes should be placed on a noncombustible fl oor or on the ground, well away from all combustible materials,
pending fi nal disposal. If the ashes are disposed of by burial in soil or otherwise locally dispersed, they should be
retained in the closed container until all cinders have thoroughly cooled.
CATALYTIC COMBUSTOR REPLACEMENT
If the combustor must be examined or replaced, follow this procedure;
1. Allow the furnace to burn out and cool down.
2. Open the door and the bypass door. Remove the fl ame shield underneath the combustor.
3. Th
e combustor may now be seen. Push the combustor from underneath up into the area behind the bypass
door. Th
e combustor can now be taken out thru the bypass opening.
4. Th
e gasket material around the stainless band will probably disintegrate as the combustor is removed. If the
combustor is placed back in the furnace, the gasket material MUST be replaced. Obtain a piece of gasket
from your dealer. When installing the gasket ensure the ends are butted closely together.
5. Do not burn the furnace with the combustor removed, or without the gasket around the combustor.
6. To replace the combustor, fi rst clean the combustor seat and the area around it. Also take this opportunity to
clean the area around the by-pass -- use a vacuum cleaner.
7. Lift the new combustor into position, with the stainless fl anges up. Th
e combustor should easily slide into
position. Don’t be concerned if it appears a bit loose. Th
e insulation around the outside of the stainless band
will expand during the fi rst fi re and will hold the combustor in.
8. Reinstall the fl ame shield.
Содержание APEX CBT
Страница 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Страница 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Страница 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Страница 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...