OM-APEX E V1.06
November 19, 2012
Page 22
APEX CBT
Fig. 22 ELECTRICAL CONNECTIONS WOOD/OIL WOOD/GAS (WOOD/ELECTRIC)
Th
is Figure is not a physical representation of your electrical connections. Limit switches and relays may be laid
out diff erently than shown. Th
e words and letters marked on the switches and relays should be followed and
connections made to the proper locations.
WIRING DIAGRAM FOR THE CONNECTION OF THE APEX CBT TO AN
ALTERNATIVE GAS OR OIL FURNACE WITH 120 VAC FAN CONTROL.
INSTALLATION INSTRUCTIONS - Combination APEX-Gas/Oil
Содержание APEX CBT
Страница 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Страница 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Страница 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Страница 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...