OM-APEX E V1.06
November 19, 2012
Page 27
APEX CBT
FAN OPERATION
Th
e blower will be turning on and off automatically based on the heat output off the wood furnace. At 150 F in
the plenum the fan will turn on and at 100 F it will turn off .
If the fan turns on regularly in standby mode (no call for heat) adjust the low output so less heat will be produced
at low (see “OPERATING INSTRUCTIONS cont.” on page 26, fi g. 25).
PLEASE NOTE: Th
e limit /safety switches have an auto / manual switch. Normal operation is set to AUTO.
LIGHTING THE FIRE
NEVER START A FIRE UNLESS ALL BRICKS ARE CORRECTLY PLACED INSIDE THE
FIREBOX. CHECK THE INSTALLATION INSTRUCTIONS CAREFULLY. ALWAYS OPEN THE
BYPASS DOOR BEFORE OPENING THE LOADING DOOR. ONCE THE LOADING DOOR IS
CLOSED, CLOSE THE BYPASS DOOR DIRECTLY AFTER.
BUILD A SMALL FIRE THE FIRST TIME YOU USE YOUR APEX CBT. STARTING OFF WITH A
HOT INTENSE FIRE CAN DAMAGE THE CAST-LINERS.
• Turn up the wall thermostat to open the draft
• Open the bypass door
• NEVER USE FLAMMABLE FLUIDS TO START THE FIRE
• On top of crumpled paper place split dry kindling and then small wood.
• Light the fi re as low as possible and leave the door 1/2” (13 mm) open.
• Once the kindling is well ignited or the coals revived, load 2 or 3 fi re logs in such a way that the fl ames can
work their way between the logs, then close the door and immediately close the bypass door aft er (this will
supply more combustion air)
• Aft er a few minutes check to see if the catalytic monitor indicates 500 F or higher, if not, repeat the last two
steps.
• When a decent fi re is going, add larger pieces of wood.
• High temperature paints will give off an odor the fi rst time you light your furnace. Open a window to ensure
adequate ventilation.
• Th
e damper will close when either the plenum temperature reaches the limit level or the room temperature
reaches the thermostat setting.
CAUTION: Air dampers are set in the factory, never adjust or open dampers manually to
increased fi ring for any reason.
• Th
e circulation blower should cycle off and on automatically, according to plenum temperature.
OPERATING INSTRUCTIONS cont.
Содержание APEX CBT
Страница 5: ...OM APEX E V1 06 November 19 2012 Page 5 APEX CBT APPLIANCE DIMENSIONS ...
Страница 7: ...OM APEX E V1 06 November 19 2012 Page 7 APEX CBT CERTIFICATION LABEL ...
Страница 33: ...OM APEX E V1 06 November 19 2012 Page 33 APEX CBT BRICK LAYOUT ...
Страница 40: ...OM APEX E V1 06 November 19 2012 Page 40 APEX CBT NOTES ...