STL27 – STL28
40
XIII) MAINTENANCE BOOKLET
INITIAL TEST
No
Description of the test
YES
NO Notes
1 Check floor consistency
□
□
□
2 Check safety distances (from the walls, columns, ceiling and other machines)
□
□
□
3 Check electricity supply line
□
□
□
4 Check compressed air supply line (depending on the model)
□
□
□
5 Check lift balance
□
□
□
6 Check lift operation
□
□
□
7
Check operation of the mechanical safety systems
□
□
□
8
Check operation of the electrical safety systems
□
□
□
9 Check lift under load
□
□
□
10 Check lift anchoring
□
□
□
11 Check oil level
□
□
□
12 Check hydraulic malfunctions
□
□
□
13 Check pneumatic malfunctions (depending on the model)
□
□
□
14 Instruction manual
□
□
□
Comments:
Installer
Stamp and signature
User
Stamp and signature
Date
Date of the next test: