CB (E7) 06/2018
Page 3/174
5.6
Principle of controller entries ............................................................................................................. 49
5.7
Performance during and after power failures .................................................................................... 49
5.8
Performance when opening the door ................................................................................................ 50
6.
START UP ............................................................................................................ 50
6.1
Turning on the chamber .................................................................................................................... 50
6.2
Controller settings upon start up ....................................................................................................... 51
6.3
Entering the altitude of the installation site ....................................................................................... 52
6.4
Factory settings ................................................................................................................................. 52
6.5
Equilibration time ............................................................................................................................... 53
6.6
Operating the DuoDoor™ door lock .................................................................................................. 53
6.7
Required gas supply for the chamber with O
2
control ....................................................................... 54
6.7.1
Hypoxic control range 0.2 vol.-% up to 20 vol.- % O
2
(regular) .............................................. 54
6.7.2
Alternative control range 10 vol.-% up to 95 vol.-% (option) .................................................. 54
6.7.3
Operation without O
2
control ................................................................................................... 54
6.8
Activating / deactivating CO
2
, O
2
and humidity control ..................................................................... 55
6.9
Humidity control of the Permadry™ system ...................................................................................... 56
7.
SET-POINT ENTRY IN “FIXED VALUE” OPERATING MODE ........................... 57
7.1
Set-point entry through the “Setpoints” menu ................................................................................... 58
7.2
Direct setpoint entry via Normal display ............................................................................................ 59
7.3
Special controller functions via operation lines ................................................................................. 60
7.4
Safety instructions for setting high gas concentrations ..................................................................... 61
8.
TIMER PROGRAM: STOPWATCH FUNCTION .................................................. 62
8.1
Starting a timer program ................................................................................................................... 62
8.1.1
Performance during program delay time ................................................................................ 62
8.2
Stopping a running timer program .................................................................................................... 63
8.2.1
Pausing a running timer program ........................................................................................... 63
8.2.2
Cancelling a running timer program ........................................................................................ 63
8.3
Performance after the end of the program ........................................................................................ 63
9.
TIME PROGRAMS ............................................................................................... 64
9.1
Starting an existing time program ..................................................................................................... 64
9.1.1
Performance during program delay time ................................................................................ 65
9.2
Stopping a running time program ...................................................................................................... 65
9.2.1
Pausing a running time program ............................................................................................. 65
9.2.2
Cancelling a running time program ......................................................................................... 65
9.3
Performance after the end of the program ........................................................................................ 65
9.4
Creating a new time program ............................................................................................................ 66
9.5
Program editor: program management ............................................................................................. 66
9.5.1
Deleting a time program ......................................................................................................... 67
9.6
Section editor: section management ................................................................................................. 68
9.6.1
Add a new program section .................................................................................................... 69
9.6.2
Copy and insert or replace a program section ........................................................................ 69
9.6.3
Deleting a program section ..................................................................................................... 70
9.7
Value entry for a program section ..................................................................................................... 71
9.7.1
Section duration ...................................................................................................................... 71
9.7.2
Set-point ramp and set-point step ........................................................................................... 72
9.7.3
Special controller functions via operation lines ....................................................................... 74
9.7.4
Setpoint entry .......................................................................................................................... 75
9.7.5
Tolerance range ...................................................................................................................... 75
9.7.6
Repeating one or several sections within a time program ...................................................... 76
9.7.7
Saving the time program ......................................................................................................... 77
10.
WEEK PROGRAMS ............................................................................................. 78
10.1
Starting an existing week program .................................................................................................... 78
10.2
Cancelling a running week program ................................................................................................. 78
10.3
Creating a new week program .......................................................................................................... 79
Содержание CB 170
Страница 165: ...CB E7 06 2018 Page 165 174 25 9 Dimensions CB 170 Dimensions in mm...
Страница 166: ...CB E7 06 2018 Page 166 174 26 Certificates and declarations of conformity 26 1 EU Declaration of conformity...
Страница 167: ...CB E7 06 2018 Page 167 174...
Страница 168: ...CB E7 06 2018 Page 168 174 27 Product registration...
Страница 175: ......